Today we are in Warwick just off of the Myton Road with Aztec Design installing a Wireless Bridge system of two Access Points, The main objective of this is to share the Buildings Internet connection in the office on the side of the house with with the rest of the building, We managed to accomplish this using only 2 access points one which has to be wired to the main router and the other in a strategic location in the centre of the house on route to the room requiring access.